Labor & Overhead Rates
Labor & Overhead Rates can be used to identify labor factors for Growing Plants. That labor factor can then be assigned on the Item Card or Spacing Schedule (which then pulls in on the routing) which is used by the Create Overhead Labor function in the Output Journal to post against the Growing Plants.
The Labor & Overhead Rates page has two sections.
General
| FIELD NAME | FUNCTION |
|---|---|
| Code | The code to identify the Labor & Overhead Rate. |
| Description | The description of the Labor & Overhead Rate. |
| Overhead Method |
|
| Blocked | If checked off the system will not pull this rate in during overhead labor calculations. |
Lines
| FIELD NAME | FUNCTION |
|---|---|
| Direct Cost | The amount to post to the Direct Cost Applied account for the Overhead Distribution Work Center's Gen. Prod. Posting Group based on the selected method. |
| Overhead Cost | The amount to post to the Overhead Applied account for the Overhead Distribution Work Center's Gen. Prod. Posting Group based on the selected method. |
| Start Date | The starting date the rate should be used for. Can be left blank. |
| End Date | The ending date the rate should be used for. Can be left blank. |