Search Results for

    Show / Hide Table of Contents

    Spacing Schedules

    Spacing Schedules can be configured and applied to routings and routing versions to set the amount of space a plant will occupy during each routing step.

    Work Centers are assigned a default amount of space per plant and a default Labor & Overhead Rate. Once the Spacing Schedule is configured, it should be assigned to a routing. The spacing and rates will default onto the routing lines based on the default Work Center selected on the Spacing Schedule Card. They can be manually overwritten.

    General FastTab


    FIELD NAME FUNCTION
    Code The code for this Spacing Schedule.
    Description The description of the Spacing Schedule.

    Lines FastTab


    FIELD NAME FUNCTION
    Default Work Center Select the default Work Center to assign a spacing amount to.
    Square Units Enter the amount of space an individual plant will occupy.
    Labor & Overhead Select the Labor & Overhead Rate to apply.

    In This Article
    Back to top Generated by DocFX